Hallanvahti Solar Park
Finland's second-largest solar park. Complete foundation scope: design validation, manufacturing and installation of 71,000 piles across 200+ hectares of peat.
Read case study →Solar farm foundation work across Finland, Sweden, the United Kingdom and Ireland — and farther when projects call for it.
Utility-scale installations and standalone test piling across Europe.

Finland's second-largest solar park. Complete foundation scope: design validation, manufacturing and installation of 71,000 piles across 200+ hectares of peat.
Read case study →
Connects the UK's largest operational solar park (373 MW) to the national grid. 1,000+ large helical piles for switchroom, transformers and electrical equipment.
Read case study →
One of the UK's largest battery-storage facilities (150 MW / 300 MWh). 1,200+ piles supporting 250 heavy 20-foot containers — held a tight commissioning schedule.
Read case study →
Complete foundation scope for a 1.5 MWp solar plant with 2P tracker structures. Helical-pile performance proven in harsh Nordic winter conditions.
Read case study →
Three days on site. Ground from bedrock to soft clay so deep piles sank under their own weight. 58 measurements produced a three-zone foundation strategy.
Read case study →
Three days across fields and bog. A stony layer at 1.5–2.5 m shaped a two-size helical-pile design covering ~80 % of the area.
Read case study →Send us project size and location, plus any soil data and plans you have. A preliminary budget comes back, fully confidential. NDA available on request.